ResidentialDELIVERED

MEP BIM & Clash Detection — High-Rise Residential, Mumbai

End-to-end MEP coordination and clash resolution across 42 floors with parallel fit-out packages.

Location
Mumbai, IN
LOD
LOD 350
Scale
1.2M sqft · 42 floors
Sector
Residential
The challenge

What the job demanded.

Forty-two floors of stacked residential MEP, with fit-out packages running in parallel against a compressed slab cycle. Riser coordination, plant-room routing, and ceiling-void clearances all had to resolve before construction reached the upper floors.

What we delivered

The outcome, in the model.

We federated architecture, structure, and MEP in Navisworks and ran weekly, zone-based clash cycles tracked in BCF. Clashes were triaged by severity and signed off floor by floor, so fabrication-ready shop drawings released ahead of each pour and the tower held its programme.

Delivered atLOD 350
Scale1.2M sqft · 42 floors
LocationMumbai, IN
More case studies

Other engagements.

Start a case record

Have a project like this? Let's scope it.

Typical turnaround· Proposal within 3 working daysTime zones· IST overlap with EU, ME, US East