AviationLIVE

Federated BIM Coordination — Airport Terminal Expansion, Gulf

LOD 300 federated model coordination across architecture, structure, and long-span MEP for a live-operations terminal expansion.

Location
Gulf · Middle East
LOD
LOD 300
Scale
780,000 sqft · phased
Sector
Aviation
The challenge

What the job demanded.

A phased terminal expansion delivered over a fully operational airport. Long-span structure, baggage handling, and MEP had to be coordinated without disrupting passenger flow, across multiple contractors working different phases at once.

What we delivered

The outcome, in the model.

We maintained a single federated LOD 300 model as the coordination source of truth, sequencing reviews to the construction phasing. Interface clashes between structure and long-span MEP were caught in the model, so the live-operations constraint held throughout the build.

Delivered atLOD 300
Scale780,000 sqft · phased
LocationGulf · Middle East
More case studies

Other engagements.

Start a case record

Have a project like this? Let's scope it.

Typical turnaround· Proposal within 3 working daysTime zones· IST overlap with EU, ME, US East