Education / IndustrialDELIVERED

Sitewide BIM Coordination — Greenfield Engineering Campus, Pune

Greenfield campus delivered at LOD 400 with sitewide coordination across labs, classrooms, central utilities, and residential blocks.

Location
Pune, IN
LOD
LOD 400
Scale
0.93M sqft · 14 blocks
Sector
Education / Industrial
The challenge

What the job demanded.

A greenfield campus of fourteen blocks — labs, classrooms, central utilities, and residential — built concurrently on one site. Underground services and shared utility corridors crossed block boundaries, so coordination had to work sitewide, not building by building.

What we delivered

The outcome, in the model.

We authored a federated LOD 400 model spanning all fourteen blocks plus the site infrastructure, with 4D sequencing to phase the build. Cross-block utility clashes resolved in the model before they ever reached the trenches.

Delivered atLOD 400
Scale0.93M sqft · 14 blocks
LocationPune, IN